Need to have a new breaker panel installed, outside from the pole to the box in the cellar quoted $10,000.seems like a lot!!
 
Posts: 141 | Location: Ma. | Registered: November 18, 2020Reply With QuoteReport This Post
Green grass and
high tides
Picture of old rugged cross
posted Hide Post
It does but without a better description of what needs done and what is included it may not be.

Can you get a second bid?

Stuff is crazy expensive these days. People are wanting premium $ plus 25%. It is really sad.



"Practice like you want to play in the game"
 
Posts: 20053 | Registered: September 21, 2005Reply With QuoteReport This Post
Member
Picture of 4MUL8R
posted Hide Post
A better title will help your inquiry.

Panel cost could be affected by its size and chosen brand of breakers. An upgrade to include a generator transfer switch would be good.


-------
Trying to simplify my life...
 
Posts: 5337 | Location: Commonwealth of Virginia | Registered: January 15, 2007Reply With QuoteReport This Post
Ammoholic
Picture of Skins2881
posted Hide Post
$10,000 is excessive. Why are you replacing the service drop? In my area that is the power company responsibility. Homeowner is only responsible for the electrical meter onward.

$3-5k is normal around here for all new 200a electrical meter, panel, and grounding.

No way to guess on the service drop without more information. Distance; overhead or underground; does it needed directional boring to go under a driveway or road; what size service?



Jesse

Sic Semper Tyrannis
 
Posts: 21376 | Location: Loudoun County, Virginia | Registered: December 27, 2014Reply With QuoteReport This Post
Member
Picture of Blackmore
posted Hide Post
We got an >$50K bid (no fixtures) to wire a <2400 sf 1½ story house with 2 car garage on a slab. It was clear he just didn't want the work. That might be the case here. Why can't these guys just man up and tell you that?


Harshest Dream, Reality
 
Posts: 3715 | Location: W. Central NH | Registered: October 05, 2008Reply With QuoteReport This Post
Member
posted Hide Post
quote:
Originally posted by Windwolf:
Need to have a new breaker panel installed, outside from the pole to the box in the cellar
Can you clarify the exact scope of the work ? What type of panel did he quote ?
 
Posts: 4469 | Location: Down in Louisiana . | Registered: February 27, 2009Reply With QuoteReport This Post
Get my pies
outta the oven!

Picture of PASig
posted Hide Post
A year or so ago I was quoted $4,000 to replace the service entrance cable from the point where it connects to the overhead utility line, the meter enclosure and the entire breaker panel to go from 100A to 200A service.

$10,000? I’d go get a bunch more estimates.


 
Posts: 35360 | Location: Pennsylvania | Registered: November 12, 2007Reply With QuoteReport This Post
Member
Picture of Blume9mm
posted Hide Post
quote:
Originally posted by Windwolf:
Need to have a new breaker panel installed, outside from the pole to the box in the cellar quoted $10,000.seems like a lot!!


as noted need more info...

is the outside panel all new or is it replacing an existing panel? I presume this means a new line from the pole/transformer to the house... upgrade from 100 amp to 200? If the panel on the outside is all new breakers with connections from an old panel inside then that is for sure a nightmare....


My Native American Name:
"Runs with Scissors"
 
Posts: 4441 | Location: Greenville, SC | Registered: January 30, 2017Reply With QuoteReport This Post
Optimistic Cynic
Picture of architect
posted Hide Post
quote:
Originally posted by Blackmore:
We got an >$50K bid (no fixtures) to wire a <2400 sf 1½ story house with 2 car garage on a slab. It was clear he just didn't want the work. That might be the case here. Why can't these guys just man up and tell you that?
Because if you give "don't want the job" as your reason, most people will try to talk you into it, wasting your time and theirs. Some people will actually take it as a personal insult. If you put enough of a a price on it where you can't afford not to do the work, you at least have a chance at a windfall.
 
Posts: 7009 | Location: NoVA | Registered: July 22, 2009Reply With QuoteReport This Post
Yew got a spider
on yo head
Picture of DoctorSolo
posted Hide Post
Always always always get multiple quotes from multiple contractors.

You will be shocked at the spread of quotes. Lowest will always be your high school buddy. Wink
 
Posts: 5269 | Location: Colorado Springs | Registered: April 12, 2006Reply With QuoteReport This Post
  Powered by Social Strata  
 

SIGforum.com    Main Page  Hop To Forum Categories  The Lounge    Any electricians on board

© SIGforum 2024