SIGforum
NFA wait times

This topic can be found at:
https://sigforum.com/eve/forums/a/tpc/f/380105858/m/5430049923

June 10, 2017, 02:46 PM
Cntrl23
NFA wait times
quote:
Originally posted by Cntrl23:
Paper Filed Form 1, Trust - SBR
Control Number: 2017471XX
Purchased: 7/5/2016
Forms Mailed: 7/11/2016
Check Cashed: 7/14/2016
Approved: 5/27/2017
Stamp Received: 6/10/2017

Now just waiting for two Form 4's sent in the same envelope.

Tax Stamp Saturday!
June 11, 2017, 05:17 PM
BucFan
My first suppressors.

Rugged Surge
Form 4 Mailed: 6-3-16
Date Approved: 3-25-16

Rugged Obsidian
Form 4 Mailed: 7-8-16
Date Approved: 6-7-16

Smile <----Me----> Big Grin



Sig P229R 9mm - Sig P365 NRA
Sig P320C 9mm - Sig P320 FS .40
June 13, 2017, 02:20 PM
ulsterman
Just called on mine. They are currently working on submissions from July 2016.
June 14, 2017, 02:44 PM
CandyMan.45
Form 4 Trust
Sub: 7/12/16
Approved: 6/7/17
Stamp @ dealer: 6/14/17
June 15, 2017, 05:19 PM
jljones
quote:
Originally posted by BucFan:
My first suppressors.

Rugged Surge
Form 4 Mailed: 6-3-16
Date Approved: 3-25-16

Rugged Obsidian
Form 4 Mailed: 7-8-16
Date Approved: 6-7-16

Smile <----Me----> Big Grin


Don't guess I understand. How are they approved before they are mailed?




www.opspectraining.com

"It's a bold strategy, Cotton. Let's see if it works out for them"



June 15, 2017, 05:23 PM
BucFan
Sorry, jljones, approved is supposed to be 2017.



Sig P229R 9mm - Sig P365 NRA
Sig P320C 9mm - Sig P320 FS .40
June 16, 2017, 07:44 AM
Andyb
Got my last two pre-41f e-file form 1's back a couple days ago. 7/11 submissions



"Pickin' stones and pullin' teats is a hard way to make a living. But, sure as God's got sandals, it beats fightin' dudes with treasure trails."

"We've been tricked, we've been backstabbed, and we've been quite possibly, bamboozled."
June 16, 2017, 09:26 AM
creslin
quote:
Originally posted by creslin:
quote:
Originally posted by creslin:
Submitted three form1s on 7/10/16 (efile/trust)
Got the first one of them back today.
Based on the control numbers... there's about 90 submissions between this one and my next one.


The second of the three just came in about 20 minutes ago.
Damn that's a long wait for things I submitted just minutes apart.


And just got my 3rd of the 3 today.





This is where my signature goes.
June 18, 2017, 05:15 PM
Beanhead
7/11/2016 form 1 e file
6/17/2017 approved @10 am. They arr workimg saturday.
June 19, 2017, 05:56 PM
ulsterman
quote:
Originally posted by Beanhead:
7/11/2016 form 1 e file
6/17/2017 approved @10 am. They arr workimg saturday.


Working Saturdays and still almost a years wait.
June 19, 2017, 11:03 PM
JohnV
Form 4 Trust through SS sent in the first SS Dump 7/7, stamp in hand 7/19 for Rugged Obsidian.





Posted from my iPhone.
June 20, 2017, 07:17 AM
creslin
quote:
Originally posted by JohnV:
Form 4 Trust through SS sent in the first SS Dump 7/7, stamp in hand 7/19 for Rugged Obsidian.



Have 3 from that same batch.
One approved on the 17th.
Two approved on the 19th.
Now I wait for the USPS and my local dealer.





This is where my signature goes.
June 20, 2017, 12:37 PM
Cntrl23
quote:
Originally posted by Cntrl23:
Paper Filed Form 1, Trust - SBR
Control Number: 2017471XX
Purchased: 7/5/2016
Forms Mailed: 7/11/2016
Check Cashed: 7/14/2016
Approved: 5/27/2017
Stamp Received: 06/10/2017

Now just waiting for two Form 4's sent in the same envelope.

Called today...and my two Form 4's are APPROVED.

Form 4, Trust - SilencerCo Omega 300
Purchased: 7/5/2016
Forms Mailed: 7/11/2016
Check Cashed: 7/14/2016
Approved: 6/16/2017
Stamp Received: TBD

Form 4, Trust - Dead Air Mask HD
Purchased: 7/5/2016
Forms Mailed: 7/11/2016
Check Cashed: 7/14/2016
Approved: 6/16/2017
Stamp Received: TBD
June 21, 2017, 08:23 PM
ARman
Approved! I eformed form 1, to make a suppressor July 14th 2016. Just received an email at 8:41 PM that I have been approved and attached PDF file with my stamp.

The signature on the form is the same as my SBR.

Now to order the parts, engrave the tube and get to drilling, cutting and such! I'm so excited to get it started!

So 311 days from eforming to approval!


ARman
June 21, 2017, 09:17 PM
creslin
quote:
Originally posted by ARman:
Approved! I eformed form 1, to make a suppressor July 14th 2016. Just received an email at 8:41 PM that I have been approved and attached PDF file with my stamp.

The signature on the form is the same as my SBR.

Now to order the parts, engrave the tube and get to drilling, cutting and such! I'm so excited to get it started!

So 311 days from eforming to approval!


ARman


You sure about that submit date?
41f went into effect on July 13th 2016.
The efile system was taken down then (for new submissions).





This is where my signature goes.
June 21, 2017, 09:27 PM
ARman
quote:
Originally posted by creslin:
quote:
Originally posted by ARman:
Approved! I eformed form 1, to make a suppressor July 14th 2016. Just received an email at 8:41 PM that I have been approved and attached PDF file with my stamp.

The signature on the form is the same as my SBR.

Now to order the parts, engrave the tube and get to drilling, cutting and such! I'm so excited to get it started!

So 311 days from eforming to approval!


ARman


You sure about that submit date?
41f went into effect on July 13th 2016.
The efile system was taken down then (for new submissions).


Nope, my email notification was 7/14/2016 @ 9:01 PM. Minutes after I submitted my eform.

My PDF, with my stamp is marked 07/14/2016. So yes I'm sure. 311 days from submitted via eforms to email notification today 06/21/2017 @ 8:41 PM EST.

I believe it was July 17th they took down the e-file....
ARman
June 21, 2017, 09:28 PM
creslin
quote:
Originally posted by ARman:
quote:
Originally posted by creslin:
quote:
Originally posted by ARman:
Approved! I eformed form 1, to make a suppressor July 14th 2016. Just received an email at 8:41 PM that I have been approved and attached PDF file with my stamp.

The signature on the form is the same as my SBR.

Now to order the parts, engrave the tube and get to drilling, cutting and such! I'm so excited to get it started!

So 311 days from eforming to approval!


ARman


You sure about that submit date?
41f went into effect on July 13th 2016.
The efile system was taken down then (for new submissions).


Nope, my email notification was 7/14/2016 @ 9:01 PM. Minutes after I submitted my eform.

My PDF, with my stamp is marked 07/14/2016. So yes I'm sure. 311 days from submitted via eforms to email notification today 06/21/2017 @ 8:41 PM EST.

ARman


Weird...
But also.. congrats!

https://www.atf.gov/rules-and-...ns-effective-july-13





This is where my signature goes.
June 23, 2017, 11:24 PM
JohnV
Form 4 Trust Submitted through local shop July 8th. Stamp in hand today. Sandman L





Posted from my iPhone.
June 27, 2017, 02:11 PM
ThankGod4Sig
So roughly one year from info submitted to SBR in hand.

F***K the .gov


"da evil Count Glockula."-Para
June 28, 2017, 05:34 PM
zoom6zoom
got my last two efiled form 1's yesterday. Submitted 7/11/16

Looks like they may be getting to the end of the pre-41 avalanche.




I have my own style of humor. I call it Snarkasm.