SIGforum
My house is built...Closed today March 5th. Video slideshow of the construction on page 8.
February 05, 2019, 06:56 PM
RHINOWSOMy house is built...Closed today March 5th. Video slideshow of the construction on page 8.
Sweetness! It's looking great!!!
So, does the ex know about your new digs yet?
February 06, 2019, 06:34 AM
frayedendsquote:
Originally posted by RHINOWSO:
Sweetness! It's looking great!!!
So, does the ex know about your new digs yet?
LOL. She does not. I haven’t had any opportunity to mention it. Kids know and both said not to say anything or she’ll just get mad. They drive to see me anyhow.
These go to eleven.
February 06, 2019, 08:41 AM
SSgt USMC/Vetquote:
Originally posted by frayedends:
Some updated pics from today. Not a lot to show inside as they have heaters and fans going to dry the mud. I'm guessing a lot will be happening Monday. We are supposed to have appliances delivered to them on on the 15th, along with light fixtures etc.
The exterior...
Deck is basically done...
View off the deck (the real reason we bought this lot)...
View out the kitchen slider...
Kitchen
Kitchen and eat-in area
This is the view coming in from the garage. Basically you are in the mudroom, can see into the bathroom on the left and the eat in area of the kitchen straight ahead where the heater is.
A couple more views of that drain pipe, from the kitchen sink down to the outflow pipe to septic. Maybe the clean outs make more sense now? I think the questionable one in the post above isn't a clean-out so much as just a plug at the end of that pipe. You can also see where the basement is plumbed for future bath in the last pics.
XLT: I think the drain pipe placement makes more sense now that you can see the foundation. The foundation wasn't visible in the other picture. I'd have to frame around the drain pipe regardless because of the concrete. It was hard to see that in the other picture because it's a walkout basement and I didn't capture the foundation.
His sewer line installation is referred to what is called a hung sewer. Notice where the sewer exists the wall not the foundation floor (basement is lower grade than his sewer outfall grade). If bath/shower/sink and or toilet is installed an injector or grinder pump will be needed to get wastewater
to exit grade. Remember shit rolls down hill.
February 06, 2019, 09:31 AM
frayedendsquote:
Originally posted by SSgt USMC/Vet:
His sewer line installation is referred to what is called a hung sewer. Notice where the sewer exists the wall not the foundation floor (basement is lower grade than his sewer outfall grade). If bath/shower/sink and or toilet is installed an injector or grinder pump will be needed to get wastewater
to exit grade. Remember shit rolls down hill.
If you look closely at the last picture, under that bag of insulation is the tank for the ejector pump. We planned ahead for that. Septic is in front. Lot is sloped and has a walkout basement. Septic in front gives us space for future pool in back.
These go to eleven.
February 06, 2019, 09:41 AM
Johnny 3eaglesI find it remarkable that your house is being built faster than the repairs to my sons house in Panama City from Hurricane Michael (October 2018)!
BIDEN SUCKS.
If you're goin' through hell, keep on going.
Don't slow down. If you're scared don't show it.
You might get out before the devil even knows you're there.
NRA ENDOWMENT LIFE MEMBER
February 06, 2019, 11:45 AM
maladatSomehow, I just saw this thread for the first time. I'm also amazed at how fast it is going up! Looks like a great house.
quote:
Originally posted by frayedends:
Front of the house, you can see the propane line. It is very small for the amount of propane I think we need. I guess propane doesn't need as much as NG as far as supply line size? We will have water heater, propane range, propane heat and propane to the deck for the grill.
Propane has 2.5 times the energy content of natural gas and depending on your setup may be at significantly higher pressure than natural gas, as well. Both of those mean a smaller pipe for the same amount of energy coming into the house.
February 07, 2019, 08:11 PM
frayedendsWell a lot going on but not a lot to show. The tile is almost done. I didn't get pictures (well I did but for some reason I'm having issues with uploading them).
Cabinets are delivered. Hardwood flooring and doors are all delivered and in the garage awaiting install. Walls have been primed.
Well pump is in...
Electric box and the Generac generator install started.
Cabinets are delivered, primer done on walls...
Fireplace mantle installed...
Keep in mind this is 2 days from my last visit. They tiled 3 bathrooms (shower tiling is started but only the waterproof orange stuff is up now). They primed the entire house. The cabinets and hardwood have all been delivered, along with doors and moldings. It's moving fast. I suspect a ton of progress this week.
These go to eleven.
February 07, 2019, 08:52 PM
nasiga good looking home on a very nice lot. congrats
These go to eleven.
February 09, 2019, 03:51 PM
rangeme101if your right handed you might want your dishwasher to the right of your sink. your drawing shows it to the left.
are you doing both built in oven/microwave and a range/oven? if your doing oven/microwave built in,have you considered just a range top with cabinet space underneath? this gives a richer look to house than a slide in range/oven combo.
overall looks great and like others have said cant believe how fast its going up. I have been in the builder business and this one if going together quickly. looking forward to the finished product. you guys look like you did your homework and went with good long term upgrades and good working spaces.
" like i said,....i didn't build it, i didn't buy it, and i didn't break it." February 09, 2019, 09:25 PM
frayedendsquote:
Originally posted by rangeme101:
if your right handed you might want your dishwasher to the right of your sink. your drawing shows it to the left.
are you doing both built in oven/microwave and a range/oven? if your doing oven/microwave built in,have you considered just a range top with cabinet space underneath? this gives a richer look to house than a slide in range/oven combo.
overall looks great and like others have said cant believe how fast its going up. I have been in the builder business and this one if going together quickly. looking forward to the finished product. you guys look like you did your homework and went with good long term upgrades and good working spaces.
I hadn’t thought about the right handed thing. I just realized I’m right handed and my dishwashers have always been on the left. Oh well. At this point it’s too late to change. I’m used to it.
We have a full range and a combo microwave/oven. Too late to change that too but it’s what we want. Extra oven for parties. We like to entertain.
These go to eleven.
These go to eleven.
February 12, 2019, 05:32 PM
remsigThis thread is so cool. I love your house and seeing it from beginning to end is really neat.
February 12, 2019, 07:56 PM
frayedendsquote:
Originally posted by remsig:
This thread is so cool. I love your house and seeing it from beginning to end is really neat.
Thanks! We are getting excited. Things moving fast now. We are doing final inspection on the 22nd.
These go to eleven.
February 12, 2019, 08:14 PM
Skins2881quote:
Originally posted by frayedends:
quote:
Originally posted by remsig:
This thread is so cool. I love your house and seeing it from beginning to end is really neat.
Thanks! We are getting excited. Things moving fast now. We are doing final inspection on the 22nd.
That's just plain nuts. I've seen a huge number of small additions or even large kitchens/remodels take longer than your entire house.
Hell one remodel I worked on was over 9 months. Granted it was featured in some highfalutin home design magazine and Washington Post writeup.
Jesse
Sic Semper Tyrannis February 13, 2019, 05:37 PM
frayedendsquote:
Originally posted by Skins2881:
quote:
Originally posted by frayedends:
quote:
Originally posted by remsig:
This thread is so cool. I love your house and seeing it from beginning to end is really neat.
Thanks! We are getting excited. Things moving fast now. We are doing final inspection on the 22nd.
That's just plain nuts. I've seen a huge number of small additions or even large kitchens/remodels take longer than your entire house.
Hell one remodel I worked on was over 9 months. Granted it was featured in some highfalutin home design magazine and Washington Post writeup.
Yeah these guys are fast. Painters were in today. They had already primed one coat. Now they are prepping and priming again. The utility pole went up today and electric was connected from the street.
These go to eleven.
These go to eleven.
February 16, 2019, 10:26 PM
6gunsJust curious, why the dark cabinets under the island when the wall cabinets are white?
SIGforum: For all your needs!
Imagine our influence if every gun owner in America was an NRA member! Click the box>>>
February 17, 2019, 05:42 AM
frayedendsquote:
Originally posted by 6guns:
Just curious, why the dark cabinets under the island when the wall cabinets are white?
Probably because we just watch too much HGTV and it’s a common design element on there now.
These go to eleven.
February 17, 2019, 07:23 AM
6guns
SIGforum: For all your needs!
Imagine our influence if every gun owner in America was an NRA member! Click the box>>>